SafeWay Bulgaria - системи за сигурност.
CT Clamp Load Management Kit - Single Phase Instant Consumption Monitoring Sensor
CT Clamp Load Management Kit - Single Phase Instant Consumption Monitoring Sensor
Couldn't load pickup availability
The sensor is installed in the main electrical panel after the electricity meter and connected via a cable to EVPoint EV7 and EV22 charging stations. Through it, the station can monitor the power consumption of all appliances in the circuit, and if the limit is exceeded, it will reduce the charging power.
The sensor is designed to be installed in the main electrical distribution panel from which the station is powered. The current transformer is attached to the phase conductor. It is not necessary to disconnect the conductor, because the current transformer opens like a clamp and locks once it is installed on the cable. To connect the CT Clamp sensor to the charging station, a four-core cable must be routed between the panel and the charging point. An FTP cable can also be used, with four of the cores used for the CT Clamp, and the remaining four can be used for the "Dynamic Load Management" (DLM) function or for an internet connection via Ethernet. For additional information, you can read our detailed installation user manual, which can be found in the "Resources" section.
- RESOURCES
